Sports

Rayo Vallecano: Vallecas stadium is facing the first phase of its comprehensive renovation in 2025

160
×

Rayo Vallecano: Vallecas stadium is facing the first phase of its comprehensive renovation in 2025

Share this article

ERay is living a special season. And in this case not only because it is already a Centenary Club, but because next year 2025 will begin something that a significant part of the fans have been demanding for a long time: the first stage of the renovation of the valikas Stadium. The community of Madrid has started working He has already designed a project to improve the Madrid venue so that ” Rayo Vallecano can continue to play as long as he needs to.”

The works of this first stage will have Independent executive investment of 2 million euros, It will be the initial step of comprehensive reform. As announced by the minister of Culture, Tourism and sports, Mariano Di Paco Serrano:” the goal is for Rayo Vallecano to continue playing matches in the best conditions, ” said Di Paco Serrano. Before the start of this project, the minister coordinated the actions with the president of the club and his counterpart in the Liga de Futebol, Javier Tebas.

What does this first stage of business consist of?

On the basis of it The completion of this first stage of repairs is scheduled for the second half of next year, The community of Madrid has clarified what the work to be carried out will consist of. And, in summary, such tasks come in response to what the Resta were demanding every day in the league.

“To eliminate oxidation in the reinforcement of columns and walls , renew the beams of the upper floor , repair the lower wall of the southern tier or Cracks in the inflated petticoats. In addition, false ceilings, cracks and cracks in the facade of the Union district will be replaced,” they list from the executive branch.

However, there are still tasks of this first episode of the reform: “Stairs to terraces and terraces will be painted; Toilets belonging to the terraces will be arranged; and on the roof of Albufeira Street, Galvanized sheet metal plates will be installed, Among others. In the same way, one of the tarmac covers will be replaced, in addition to the spaces currently ceded to Madrid sports federations such as boxing, table tennis, billiards, chess, among others.”

Leave a Reply

Your email address will not be published. Required fields are marked *

Powered by WordPress - Theme: wpmedia.